|
||||||||||||||
Case Histories
Petrochemical plant was experiencing serious problems with the molds fouling due to poor control. EquiSol worked with the corporate engineering, corporate IT, and the local water treater to design and install a fully redundant control system that was tied into the plant's LAN. We also gave them a MODBUS TCP/IP interface so that the operation could be monitored remotely from the corporate headquarters in the mid-west. Based on this success, they have decided to make this plant standard for all their facilities.
|
News Equisol completes $130K automation installation for Lawnmower Manufacturer (February, 2008)
Four Tower Bridge |
|||||||||||||
Home |
The Equisol Difference |
Industries |
Equipment |
Services |
Capabilities |
Case Histories |
Partners |
Careers |
About Equisol |
Licenses |
Contact Us |
Disclaimer