Employees | Contact Us

 

Case Histories

Client: Engineering Firm - Groundwater Remediation
Contract Amount:
Project Length:
Equisol Contact: Mike Cooper    484.571.9360
 
Description: remove contaminated water with TCE from a retired PC manufacturing site

In 2005, an engineering firm was awarded a project to remove contaminated water with TCE from a retired PC manufacturing site. The water is removed by several wells for the process. The final treatment strategy was in the pilot test phase and multiple processes were tested.

The engineering firm needed to have data recorded for the test, so full scale plant could be designed that could be monitored remotely.

As part of this monitoring process, the firm required redundant ORP monitors to check the remediation process for “break through”. This portion of the project, including installation and start-up, were provided by EquiSol.

This system allowed the engineering firm to monitor the retired pc manufacturing site 24X7 from anywhere in the world. The pilot study was completed, the full-size plant was put into service in 2006, and is currently operational.

 

 
 

HomeThe Equisol Difference IndustriesEquipment  |  Services  |  Capabilities  |  Case Histories  | 
PartnersCareers  |  About Equisol  |  Licenses  |  Contact Us  |  Disclaimer